DIA SOUTH TERMINAL

The expansion of Denver International Airport’s Jeppesen Terminal included the construction of a five-star hotel and light rail platform. RD Pipeline has been involved in many projects at DIA over the past 20 years, with a relationship pre-dating the airport’s opening.

OUR INVOLVEMENT

RD Pipeline was hired to install the water and sanitary sewer infrastructure. The 16” steel Denver Water improvements incorporate the installation of approximately 3000 LF of pipe, appurtenances and services to the hotel. The 12” sanitary sewer installation included approximately 2000 feet of pipe, manholes and tunneling. The phasing of our work was critical to the entire project and presented multiple challenges for each phase. The RTD FasTracks schedule incorporated multiple “move ins and outs” and cooperation with other trades.